About Tiny House Titans
Founded in 2025, Tiny House Titans is an ADU contractor and builder serving clients across the Northeast. The company was established with a focus on creating accessory dwelling units that combine functional design with modern construction practices. Their team includes licensed engineers and a general contractor, handling projects from initial concept through to final inspection.
The team behind Tiny House Titans includes Dan Barron, a Principal Design Engineer specializing in structural and geotechnical design, and Jon Farrell, a General Contractor overseeing construction. Together, they manage the full scope of ADU projects for homeowners throughout the region.
ADU Design and Construction Services
Tiny House Titans operates as a turn-key ADU builder, meaning they take care of the entire process — from zoning analysis and design to permitting and construction. Their units range from 200 to 1,000+ square feet, making them suitable for a variety of property types and needs, including detached ADUs, garage conversions, and other accessory dwelling unit configurations.
The company offers a selection of pre-engineered designs that can be adapted to different lot sizes and client requirements. Custom design is also available for those whose site or vision doesn't fit a standard layout. Their design approach draws on geometric forms and clean lines, with an emphasis on making the most of compact spaces through practical, purpose-driven layouts.
Key aspects of their service include:
- Full zoning and permitting management
- Site analysis and concept design
- Permit documentation and local authority coordination
- Construction and final inspection
- Transparent pricing with estimates available early in the process
Sustainability is also a stated priority. Tiny House Titans incorporates energy-efficient materials and construction methods into their builds, with the goal of reducing the environmental impact of each project.
Project Timelines and Costs
Timelines for ADU projects vary depending on the type and complexity of the build. As a general guide:
- Garage conversion contractor projects typically take between 3 and 6 months from design to completion.
- Detached ADU builder projects generally run 6 to 12 months, including the permitting phase.
In terms of cost, accessory dwelling unit construction through Tiny House Titans is estimated at approximately $250–$400 per square foot, depending on the size and specifications of the unit. Detailed cost estimates are provided following an initial consultation, rather than as a fixed upfront figure.
For homeowners considering a backyard cottage, granny flat, in-law suite, or a smaller JADU (Junior Accessory Dwelling Unit), Tiny House Titans handles the permitting and zoning compliance specific to each local jurisdiction, which can be one of the more complex parts of the ADU development process.
Their stated process follows five phases: Site Analysis, Concept Design, Permit Documents, Construction, and Final Inspection — providing a structured path from the early planning stages through to a completed, code-compliant unit.