Drake Construction: ADU Design and Build Services
Drake Construction designs and builds accessory dwelling units (ADUs) for homeowners looking to make better use of their property. Whether the goal is generating rental income, housing a family member, or adding a dedicated workspace, their team handles the full scope of the project — from initial design through final construction.
As a full-service ADU contractor, Drake Construction manages every phase of the build. This includes architectural planning, city permitting, subcontractor coordination, inspections, and final delivery. Clients work with a single point of contact throughout, which helps keep communication clear and the project on track.
ADU Types Drake Construction Builds
The right ADU solution depends on a property's lot size, local zoning regulations, and the homeowner's goals. Drake Construction works with clients to identify the most practical layout for their specific situation. Their services cover a range of accessory dwelling unit styles:
- Detached ADUs: Standalone backyard cottages that offer privacy and independence from the main residence
- Attached ADUs: Additions that share a wall with the primary home
- Garage conversions: Transforming an existing garage structure into livable space
- Above-garage units: Elevated living spaces built over an existing garage, preserving parking below
- Junior ADUs (JADUs): Conversions of interior space or basements within the existing home footprint
Each of these options can be customized to suit the homeowner's preferences, the property's aesthetic, and local building requirements.
Drake Construction's build process covers all the technical components involved in ADU construction, including:
- Site evaluation and permitting
- Architectural design and floor planning
- Foundation and structural work
- Electrical, plumbing, and HVAC systems
- Interior and exterior finishing
Permitting, Zoning, and Project Timelines
Building an ADU involves navigating local setback requirements, height restrictions, and lot coverage limits. Drake Construction manages the entire permitting submittal process, coordinating directly with municipal departments to address structural engineering requirements, utility load considerations, drainage plans, and any necessary infrastructure upgrades. Handling these details early in the process helps avoid delays once the project moves into the building department review stage.
As for timelines, ADU projects vary depending on design complexity, permitting schedules, and site conditions. Most builds range from 4 to 12 months from initial design to completion. Drake Construction provides a detailed project schedule early on so clients have a clear picture of each milestone along the way.
Design decisions are made collaboratively. The client's input is central to the process, and Drake Construction's team works to balance personal preferences with practical recommendations — factoring in layout efficiency, material selection, and long-term durability. The aim is an ADU that functions well, holds its value, and fits naturally with the existing property.
For homeowners considering a granny flat, in-law suite, casita, or any other form of accessory dwelling unit, Drake Construction offers the experience and project management structure to take a build from concept to move-in ready.